



The goals of this client were to have more space. During the planning stage we assisted them in designing the second floor and reconfiguring the first.
The first thing we did was tear off the roof, then constructed the second floor. We redesigned the kitchen to accommodate the new stairway going upstairs. There was additional space added above the garage. During the project the client decided he wanted a walkout basement as well. This was completed on the side of the home under the covered porch. The client lived in their home the entire time during construction.
This home went from a 960 sq. ft. rambler to a 2600 sq. ft. two-story. This project took about 7 months.